The director plans for drinking water supply (PDA) are the fundamental element for planning investments in the supply network, based on the current and future issues and needs of the municipality. The PDAs allow for the analysis of the characteristics of the system and its behavior, detecting weaknesses and evaluating the needs posed by urban growth. At ABM, we have extensive experience, having drafted around a hundred for more than 80 municipalities over the past few years.
Data collection of inventory using Geographic Information Systems (GIS)
Forecasting population consumption increases through urban planning analysis
Study of the sufficiency of supply sources in the present and future
Hydraulic modeling for diagnosis and forecasting using EPANET, linked to GIS through the Giswater tool
Diagnosis of network issues (existing or future) and development of action proposals supported by GIS tools
Economic assessment of investments